June 2010 - Present
BCV Networks Alliance - Bankstown Ashfield Trunkmain 1260m of DN300 DICL including thrust bores, valves,            
                                       anchors, connections and restraints.
 
May 2010 - Present
The Reed Group             - Norwest Precinct Works - Watermain Work Lot 12
                                       - Installation of 4.5km of DN450, 750, 900 & 1050 DICL and Sintakote SCL pipe including 
                                          thrust bores, concrete encasement and major thrust block design.  Includes dual and
                                          triple main installation within shared trench within roadway.  Welding works, inspection
                                          points, valves, hydrants and connections.
                                       - Kellyville, Sydney
                                       - Water Main laying to Sydney Water standards and supervised by Australian Water.
 
Commencing June 2010
The Reed Group             - Norwest Precinct Works - Watermain Work Lot 11
                                       - Installation of 6.3km of DN450, 750 & 900 DICL and Sintakote SCL pipe including 
                                          thrust bores, concrete encasement and major thrust block design. Includes dual and triple
                                          main installation within shared trench within roadway.  Welding works, inspection points,
                                           valves, hydrants and connections.
                                       - Kellyville, Sydney
                                       - Water Main laying to Sydney Water standards and supervised by Australian Water.
 
May 2010 - Present
Christie Civil                   - Frasers Broadway - Nightworks
                                       - Installation of 200m of 1500mm dia RCP stormwater pipe.
                                       - Includes break into Ovoid pipe, construction of 4m x 2m wide pit 3.8m deep at intersection of
                                          Abercrombie Street and Broadway.
                                       - Construction of 2m x 2m stomwater pits up to 3.8m deep.
                                       - Shoring and steel plate design in order to open Abercrombie Street up for traffic during day.
 
April 2010 - Present
BCV Networks Alliance - Hyde Park Road Trunkmain 1750m of DN450 DICL including OD560 PE installed via HDD Bore under golf course.
 
March 2010 - Present
BCV Networks Alliance   - Reticulation 11 & 12 - Southern Pipecracking Portion 1
                                       - Installation of 2.1km of OD125 & OD180 PE pipe including pipecracking and PE welding.
 
March 2010
City of Ryde   - Darvall Road, Denistone West
                      - Installation of DN900 and 600 RCP stormwater pipes and form and pour chambers (N12 Reinforcement) ranging in size from 1200 x1200mm to 2400x1200mm and up to 7m deep.
 
February 2010 - Present
BCV Networks Alliance   - Trunkmains Package 3
                                       - All works associated with the installation of 2km of DN375 & DN450 Trunkmains in Lynwood Ave, Cromer, Plateau Ave, Collaroy and Hyde Park Road in Auburn including service transfers, HDD boring, PE Welding and connections.
                                        
 
February 2010 - Present
BCV Networks Alliance - PRV Installation Packages around Sydney area including installation of precast pits, piled
                                       anchor blocks, pipework, installation of Pressure reduction valves, flowmeters, electrical
                                       conduits, kiosk plinth and connections to 1350mm diameter.
 
 
January 2010 - Present
The Reed Group   - Norwest Precinct Works - Sewer Work Lot 16
                                       - Installation of 3km of DN450 PPP SN10,000 including thrust bores, ventshafts, manholes and
                                         concrete encasement.
                                       - Kellyville, Sydney
                                       - Sewer Main laying to Sydney Water standards and supervised by Australian Water.
 
December 2009 - March 2010
The Reed Group   - Norwest Precinct Works - Sewer Work Lot 13
                                       - Installation of 1km of DN450 PPP SN10,000 including thrust bores, ventshafts, manholes and
                                concrete encasement.
                                       - Alex Ave, Kellyville, Sydney
                                       - Sewer Main laying to Sydney Water standards and supervised by Australian Water.
 
 
January 2010 - February 2010
The Reed Group   - Norwest Precinct Works - Sewer Work Lot 7
                                       - Installation of 700m DN1050 RCPs including precast pits, headwall, dissipator and security fencing.
                                       - Rouse Hill, Sydney
                                       - Sewer main laying to Sydney Water standards and supervised by Australian Water.
 
 
 
January 2010 - February 2010
SewerFix      - East Esplanade in Manly, Sydney - Construction of concrete chamber over existing Sewer overflow line.
 
 
December 2009 - Present
BCV Networks Alliance - 2.65km of pipecracking to upgrade water reticulation throughout Outer West (Bankstown Area)
                                                in Sydney.  Includes all connections, service transfers, traffic control and permanent restoration.
 
 
December 2009 - February 2010
BCC Networks Alliance       - Installation of 733m of DN300 PVC Pipes at the Princes Highway in Albion Park.
                                           - Installation of 868m of DN300 PVC Pipes including services at Alice St in Newtown.
 
November 2009 - January 2010
Sewerfix      - Peripheral works connecting to DN375 Sewer Microtunnelled under Broadway in the City.  Includes thrust bores, installation of precast sewer pits and property connections and tie ins.
 
September 2009 - December 2009
 
TRN       - Lay DN150 & 225 Sewer Pipe in new Subdivision Case No 113652WW off Campbelltown
                 Road, Glenfield.  Sewer Main Laying to Sydney Water Standards. 
 
 
 
September 2009 - Present
 
BCC Networks Alliance       - Installation of Pressure reduction Valves, Flowmeters, pipework, monitoring
                                                     points and Dividing Valves in Linden, Belrose, Mobbs Hill and West Pennant Hills. 
                                                    Includes excavation and installation of precast concrete chambers up to 2350 x 2300
                                                    x 1650 deep.  Over 30 locations.
 
September 2009 - Present
 
BCC Networks Alliance       - Lay 750m of DN600 DICL & OD660 SCL sintakote and concrete encased Pipe
                                                     in. Nuwarra Road, Moorebank.  Watermain installation includes installation in tight
                                                     easement beneath retaining wall.  Testing incuded soil classification every 100m.
 
October 2009 - January 2010
 
PSP Alliance         - 3 Towns Project - Lay 1000m of DN160 PE in Glossodia, Northwest of Sydney.
                                   - Construct Pump Station including services, road preparation, K&G and bulk earthworks.
 
 
 
June 2009 - January 2010
 
Bulk Water Alliance       - Cotter Dam Project M2C for Bulk Water Alliance.  Pipe Laying including 1404 MSCL Sintakote Pipe, DN960 DICL mains and DN1200 to 450 RCP stormwater overflow.  Works for lead in and outlet pipework for new Cotter Dam pumpstation.
                                             - Watermain laying to Australian Water Standards
 

 

 
Picture1046.jpg
M2C Cotter Dam Project, Canberra.  DN960
 
Picture1054.jpg
Sintakote Pipe
Canberra
 
Picture1058.jpg
Canberra Sintakote Pipe
 
Picture1087.jpg
Canberra
 

March 2009 - December 2009

MacConnell Dowell        - Installation of 4.5km of DN450 & DN375 dual recycled watermain in St Marys to Quakers Hill Recycled Water Project

-          Lay 1500m of DN300 DICL Pipe in asbestos contaminated ground
-       Installation of Dual main in Forrester and Links Roads, St Marys
-      Crossing of Breakfast Creek in PE and concrete encased including environmental controls (refer to photo gallery for Pictures)
-       Recycled Watermain in Sydney

 


 

July 2009 - September 2009
 
Mirvac / John M Daly     - Installation of 2300m of DN375 PVC watermain and additional 350m of DN375 SCL pipe sleeved through thrust bore DN600 steel casing to Sydney Water Standards.  Works at Camden Valley Way, Prestons.

 


 BCC Networks Alliance
 

June 2009 - September 2009

  •  430m installation of DN375 PVC pipe for sewer by Laserbore including structures at Sherbrook Rd, Hornsby
  • Sewer main works in Sydney, Australia

 


 
 

 


 
DSCF3093.JPG
St Marys to Quakers Hill dual recycled watermain for McConnell Dowell
 
DSCF3171.JPG
Pipelaying Dual Main McConnell Dowell at St Marys
 
IMG_1182.jpg
BCC Networks Alliance, access pit for microtunnel in Sherbrook Rd, Hornsby 2009
 
IMG_1178.jpg
Sherbrook Road, Hornsby - Microtunnel access pit.
 

April 2009 - July 2009
  • Recently completed Installation of 400m of DN600 DICL watermain  at the Kingsway, Miranda

 

April 2009 - June 2009
  • Installation of 400m of DN300 DICL watermain at Landy Drive, Mt Warrigal
  • Water main Laying undertaken near Wollongong.

 

February 2009 - May 2009
  •  Installation of 1500m of DN500 DICL watermain at Binda / Robsons Road, Keiraville.
  • Watermain Laying undertaken near Wollongong.

 

June & July 2009
  •  Valve installations at Birrell St Waverley and Fern St Gerringong

 

April 2009 - October 2009
  •  Pipecracking DN100 to DN200 pipe in Canterbury, Ashfield, Strathfield (Sydney, Australia)

 
05022009(6).jpg
BCC Pipelaying Robsons Road
 
11022009(7).jpg
Robsons Road Keiraville stripping asphalt in Early 2009
 
P4220088.JPG
Florence St Strathfield
 
DSCF3058.JPG
St Marys
 

PSP Alliance  
June 2009 - November 2009
  • Installation of 4500m of DN250 PE Sewer Main in Freemans Reach.
  • Sewer Main Pipelaying undertaken in Northwest of Sydney as part of the 3 towns project.
June - July 2009
  • Construction of sewer pumpstation off Cupitts Lane in Freemans Reach

 
 
January 2009 - March 2009

 

Contract Name: Asbestos Removal and installation of DN300 Recycled Watermain in Barton Park and International Peace Park
Main Contractor: McConnell Dowell
 
Role of Killard Exc Pty Ltd:
  • Excavation and disposal of asbestos contaminated spoil, lay geofabric and place pipes, fittings, valves, thrust blocks and anchors
 
 

December 2008 

 

Contract Name: Wroxham HDD Bore
Main Contractor: BCC Networks Alliance
 
Role of Killard Exc Pty Ltd:
  • Horizontally Directional Drill 100m of DN500 PE pipe including PE Welding, pilot hole, drill and drag.


November 2008  - January 2009

 

Contract Name: Pressure Reduction Valve Installation
Main Contractor: BCC Networks Alliance
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of PRVs in Bringelly, Campbelltown, Leumeah, Springwood & Warragamba


*******PIPE LAYING 2008******PIPELAYING 2008************PIPE LAYING 2008******PIPELAYING 2008************

May 2008  - January 2009

 

Contract Name: 450mm Recycled Watermain Glenfield STP
Main Contractor: BCC Networks Alliance
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 7 kms of Recycled Watermain, Glenfield to Hoxton Park including Croatia Ave. 

 
 
July 2008  - September 2008
 
Contract Name: 375mm Trunkmain Bigge St Liverpool
Main Contractor: BCC Networks Alliance
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 500mtrs of Trunkmain, Bigge St Liverpool Night Shift.
 

 
 June 2008  - October 2008
 
Contract Name: Case No 105690PW  McIntyre Street Gordon
Main Contractor: Southern Cross Developments
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 200m DN150 Watermain including a 25m thrust bore steel encased under the Pacific Highway at Gordon.

 

May 2008 - October 2008

 
Contract Name: 450mm Rising Main, Heathcote National Park
Main Contractor: BCC Networks Alliance
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 1.9 kms of 450mm rising main, exume & re-lay and by-pass every 200mts to keep existing main live.
 

 
DSCF1196.JPG
 
DSCF1195.JPG
 
DSCF1197.JPG
Deviation of DN300 Recycled Watermain around sewer and existing water at Inghams Chickens
 
DSCF1194.JPG
 

May 2008  - Ongoing
 
Contract Name: Reticulation Baulkham Hills Package
Main Contractor: BCC Networks Alliance
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 150mm to 250mm dia Water Reticulation for Sydney Water including recovery of fittings, transfer of services and connections.  Also includes excavation of entry and exit pits for pipe cracking/slip lining.
 

 
April 2008 - August 2008
 
Contract Name: RWP Amplification Stage 2 Rouse Hill
Main Contractor: John Holland
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 200 mtrs of 1050mm overflow sewer plus connections and concrete structures in Mile End Rd STP.
 

 

February 2008  - March 2008
 
Contract Name: Trunkmain Burwood Rd Burwood
Main Contractor: BCC Networks Alliance
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 30 mtrs 375 DICL Trunkmain on Burwood Rd Burwood.
 

 
November 2007 - March 2008
 
Contract Name: Middleton Grange Subdivision
Main Contractor: BMD Constructions Pty Ltd
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 150mm to 225mm dia Sewer
  • Excavation and installation of 375mm to 1050mm dia Stormwater for Sydney Water.
  • Box culverts
  • Rock walls
 

 *******PIPE LAYING 2007******PIPELAYING 2007************PIPE LAYING 2007******PIPELAYING 2007************
 
 
November 2007 - December 2007
Contract Name: Upper Blue Mountains Sewerage Scheme
Main Contractor: Priority Sewerage Project Alliance (PSP)
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of Pumpstations and connections, 150mm to 375mm dia Rising Sewer Mains and Aquaducts and new Sewer through Blackheath Tunnel in Blackheath, Blue Mountains.
 

 

 
IMG_0772.jpg
Killard Machines
 
IMG_0776.jpg
Bypass Arrangement for Sewer renewal in Heathcote National Park
 
IMG_0737.jpg
 
IMG_0719.jpg
Box culvert installation at Middleton Grange 2007
 

November 2007 - March 2007
 
Contract Name: Reticulation Package 3 North Shore Area
Main Contractor: BCC Networks Alliance
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 100mm to 250mm dia Water Reticulation for Sydney Water including recovery of fittings, transfer of services and connections.  Also includes excavation of entry and exit pits for pipe cracking/slip lining.
 

 
November 2007 - April 2007
 
Contract Name: The Village Balgowlah
 
Main Contractor: Ward Civil
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 375mm to 600mm dia Stormwater for Sydney Water.
 

 
October 2007 - January 2007
 
Contract Name: Kurnell Refinery
Main Contractor: BMD Constructions Pty Ltd
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 375mm dia Sewer
  • Excavation and installation of 375mm to 750mm dia Stormwater
  • Excavation and installation of 150mm to 375mm dia Water main
 

 
April 2007 - October 2007
 
Contract Name: Trunkmains Package 1 Liverpool Area
Main Contractor: BCC Networks Alliance
 
Role of Killard Exc Pty Ltd:
  • Excavation and installation of 375mm to 600mm dia Trunkmains for Sydney Water including recovery of fittings, transfer of services and connections.  Also includes excavation of entry and exit pits for pipe cracking/slip lining.
 

 
March 2007 - June 2007
 
Contract Name: Installation of DN150 PVC at Allied Mills Picton
Main Contractor: John Holland Pty Ltd
 
Role of Killard Exc Pty Ltd:
  • Installation of approximately 2.6kms of DN150 PVC Watermain from Picton to Allied Mills Flourmill, Picton.
 

 
January 2007 - April 2007
 
Contract Name: Water Reticulation Upgrade of DN150 at Crows Nest, Cremorne & Gordon
 
Main Contractor: EL Civil
 
Role of Killard Exc Pty Ltd:
  • Installation of  approximately 270mts of DN150 Blue Brute Watermain.
 

 
September 2006 - December 2007
 
Contract Name: T-Way Windsor Rd, Kellyville
Main Contractor: Leighton Contractors Pty Ltd
 
Role of Killard Exc. Pty Ltd:
  • Installation of 3kms of Various Size Stormwater from 300mm dia to 1200mm dia Stormwater
  • Installation of 6km of shared trench, Transmission conduits, LV conduits, subducts and roping.
  • Light pole footings and conduits for street lighting.
  • Installation of subsoil drains
 

 
June 2004 - April 2008
 
Contract Name: Site Development of Prince Henry Hospital, Little Bay, Phases 1 & 2
Main Contractor: NACE Civil Engineering Pty Ltd.
 
Role of Killard Exc. Pty Ltd:
  • Installation of approximately 6.5km of Stormwater, varying in sizes from 225mm dia. to 2m dia. including catchpits;
  • Installation of approximately 6km of Telstra Conduit;
  • Installation of approximately 5.5km of Energy Australia Conduit;
  • Installation of sub-soil drainage and various other water diversion, groundwork and site preparation work.
 

 
October 2006 - October 2006
 
Contract Name: Installation of 600mm dia Watermain for Hunter Water Dora Creek, Maitland
Main Contractor: Diona Pty Ltd
Role of Killard Exc. Pty Ltd:
  • Installation of 1 km of 600mm dia Hobas Watermain

 
IMG_0654.jpg
Completed Aquaduct at Blackheath for PSP Alliance
 
IMG_0632.jpg
 
IMG_0583.jpg
Heathcote Sewer exhume and relay DICL main
 
IMG_0536.jpg
PSP Alliance Blackheath Aquaduct
 
Home  |   About Us   |   Recent Projects   |   Gallery   |   Pipelaying across Breakfast Creek   |   M2C Canberra   |   PSP Alliance - Freemans Reach
  Nuwarra Road, Moorebank   |   Certifications & Policies   |   Current Insurances   |   Contact
self-updatable website design by havealook