Killard Excavation - Water Projects
|
List of Water Projects
Current Projects Capabilities StatementBCV Networks Alliance Water Trunkmain Programs A trunkmain is defined as a main of 375mm diameter or greater. Killard Excavation Pty Ltd has installed trunkmains along trafficable roads throughout Sydney and Wollongong since 2007. Our company has installed 21.59km of mains ranging from PVC, DICL, SCL, Sintakote, and PE. The bulk of our installation methods have been undertaken via the open trenching method; however, Killard Excavation Pty Ltd also has extensive experience in trenchless technologies such as micro tunneling, thrust boring, pipe cracking, and slip lining. Works include all supplementary works such as connections, pressure testing, valves, hydrants and control pits, thrust blocks, and welding. The value of Killard Excavation Pty Ltd's water trunkmain programs has been $24, 200, 000 to date. Water Reticulation Programs Killard Excavation Pty Ltd has undertaken many water reticulation projects for BCV Networks Alliance. A reticulation main is deinfed as a main of 300mm diameter or less. Killard Excavation Pty Ltd has undertaken the installation of predominately DN100 and 150 water reticulation mains within Greater Sydney region. Projects involve any type of pipe, from PVC, DICL, SCL, Sintakote, and PE, and by any means, including open trench, pipecracking, slip lining, directional drill or thrust bore. 41.6km of water reticulation have been delivered over the last 4 years. 23.38km have been by means of pipecracking, 1.8km were mains of 300mm diameter and a further 637 metres was between 180mm and 250mm diameter. Water reticulation projects have taken place at locations such as: - Ashfield, Bankstown
- Landy Drive, Mt Warrigal
- Baulkham Hills
- Kieraville, Wollongong
- Liverpool, Sydney
- Burwood Road, Burwood
- North Shore Area
The value of Killard Excavation Pty Ltd's water reticulation programs has been $15, 400, 000 to date. Pressure Reduction Programs Pressure Reduction Valves (PRVs) are cut into existing mains to control the water flow within the main. Killard Excavation Pty Ltd has undertaken the installation of precast pits, piled anchor blocks, pipework, installation of PRVs, flowmeters, electrical conduits, kiosk plinth, and connections to 1350mm diameter. The value of Killard Excavation Pty Ltd's PRVs has been $5, 800, 000 to date. Last updated: 24/1/2012 Current ProjectsAugust 2011BCV Networks Alliance - South West Growth Centre Stage 1 Portions 3 and 4: Richardson Road The project involves the installation of approximately 2154 metres of of DN750 DICL and OD 813 SCL Sintakote coated pipe via open trench along Richardson Road, Camden Golf Course, and Narellan Creek Open Drainage Channel including associated stop valves, air valves, hydrants, scours, and cross connections. The project also includes connections to microtunneled bores and connections to adjoining pipework. Other works included: - Installation of approximately 344 meters of ID1000 jacking pipe and OD 813 MSCL Sintakote coated butt joint with collar pipe along Richardson Road including associated stop valves, air valves, hydrants, scours, and cross connection
- Grout filling of annulus with non-shrink cemetitious grout and spacer rings
- DICL connections to adjoining pipework
Last updated: 12/10/2011
Arenco - Kiabla Road and Hurley Street, Campbelltown
The watermain adjustments at Kiabla Road and sewer adjustments at Hurley Street are required to enable construction of the Southern Sydney Freight Line (SSFL) which is between Sefton to Glenlee Junction. Works are required to extend a watermain encasement in a possession, demolish and construct two sewer manholes, and extend two sewer encasements on the SSFL track formation and batter.
Kiabla Road
Scope of works included: - Site establishment
- Installation and maintenance of traffic control measures
- Installation and maintenance of environmental controls
- Excavate and expose the end of the existing DN1200 encasing pipe during a possession
- Clean surface of existing DN1200 encasing pipe and prepare with nitrobond EP
- Drill 9 x N16 galvanised starter bars minimum 300mm into grout of existing DN1200 encased pipe and inject with HIC-RE500 epoxy
- Fix hydrotite (CJ-0725-3K) onto existing concrete surface using leakmastergun grade waterstop
- Connect reinforced concrete encasement to existing DN1200 encasing pipe
- Encase existing DN750 in reinforced concrete
- Supply and install cathodic protection including welding, recoating of watermain and concrete to test point footing
- Supply and backfill excavation with 14:1 sand cement fill and restore ground level to the condition prior to the commencement of works
- Site cleanup
Hurley Street
Scope of works include: - Site establishment
- Installation and maintenance of traffic control measures
- Installation and maintenance of environmental controls
- Excavate and expose existing manholes and sewer mains
- Demolish existing manholes to 1 metre below current surface level and remove from site
- Supply and place 10mm 316 S/S blanking plate over existing sewer main and seal edges with silicone to prevent spillage into system
- Place minimum 500mm concrete filled plug over blanking plate with the remainder filled to the surface with compacted sand
- Place 50mm blinding to base of proposed precast manholes
- Construct new manholes using DN1500 pre-lined, precast maintenance holes
- Encase existing DN450, DN375, and precast manhole bases in reinforced concrete in open trenches
- Backfilling
- Site cleanup
Last updated: 19/7/2011 Selected Completed Projects
December 2010 - January 2011
Networks Alliance - Spring Farm
The purpose of works is to pothole an existing DN1050 watermain in order to confirm its size, location, and depth. The works will include:
- The location and detailing of services with the use of underground service detector
- The excavation of 2no. potholes by hand digging, vacuum excavation or excavator
- Locating and recording size, location, and depth of existing DN1050 watermain
- Surveying centreline of existing main and detailing co-ordinates
- Backfilling in accordance with Sydney Water Standards, relevant council and/or RTA specification, including any compaction testing
- Final restoration of all disturbed surfaces to its preexisting or better condition as per relevant coundil and/or RTA requirements
- Site cleanup
- Installation of 1.5km DN1000 MSCL Sintakote pipe in mine subsidence area. Includes 13m deep microtunnel under gas main. Additionally 10m deep 1350mm diametre piles supporting anchor blocks, trench stops on steep sections, and dismantling joints and valve arrangements
Works were undertake in sensitive Aboriginal sites requiring AHIP to access. Works corridor ranging from 40m wide to 10m wide in most sensitive area. Absolute exclusion beyond works easement.Detailed scope of works Portion 1 include the following: Evacuate, lay, bedding, and backfill of trenches by installing: - DN1050 MSCL RRJ Sintakote Pipe along proposed link road to creek crossing CH 00 to CH 401 (Qty - 401 metres)
- DN1050 MSCL welded Sintakote concrete encased pipe across Gundungarra Reserve CH 401 to CH 635 (Qty - 234 metres)
- DN1050 MSCL RRJ Sintakote Pipe from Gundungarra Reserve to microtunnel receival pit CH 635 to CH 944 (Qty - 309 metres)
- DN375 MSCL welded Sintakote Pipe concrete encased pipe acorss proposed link road at Richardson Road (Qty - 309 metres)
- DN375 OPVC pipe across connection at Richardson Road (Qty - 32 metres)
- DN750 future connection at Richardson Road
- DN375 future connection at Richardson Road
- Installation of all valves, connections, thrust and anchor blocks, expansion / bellow joints, scours, hydrants, air valves, manholes, pits, chambers, and any other appurtances required by the relevant codes and/or shown on the drawings
- Connection to microtunnel under bores 2 receival pit (CH 944)
- Temporary restoration by hot mix of disturbed road surfaces
- Restoration by spray grass of all disturbed areas. Top soil to be removed and stockpiled for reinstatement prior to seeding
- DN375 MSCL welded Sintakote concrete encased pipe across proposed link road at Reynolds Street
- Site cleanup
Detailed scope of works Portion 2 include the following: Microtunnel installation: Under bore 1 installation of DN1350 concrete encasing pipes CH 1102 to CH 1145 (Qty - approx 43 metres) - Welding and installation of DN1050 MSCL Sintakoted Pipe
- Grouting of the annulus Qty m³
- Excavation, shoring, preparation, and backfilling of launch and receival pits
- Slurry disposal
- Site cleanup
Under bore 2 installation of DN1350 concrete encasing pipes CH 944 to CH 1094 (Qty - approx 150 metres) - Welding and installation of DN1050 MSCL Sintakoted Pipe
- Grouting of the annulus Qty m³
- Excavation, shoring, preparation, and backfilling of receival pit
- Slurry disposal
- Site cleanup
|
| |
 |
| Bellows pit at Springfarm
|
|
|
 |
| Spring Farm - Networks Alliance
|
|
|
 |
| Spring Farm - Networks Alliance
|
|
|
EE.jpg) |
| Spring Farm - Networks Alliance
|
|
|
Detailed scope of works Portion 3 include the following: Evacuate, lay, bedding, and backfill of trenches by installing: - DN1050 MSCL RRJ Sintakote Pipe from microtunnel receival pit (CH 1145) to Narellan South Reservoir (WS301) Hot tap. CH 1145 to CH 1454 Portion 3 (Qty - approx 309 metres)
- Installation of all valves, connections, thrust and anchor blocks, expansion / bellow joints, scours, hydrants, air valves, manholes, pits, chambers, and any other appurtances required by the relevant codes and/or shown on the drawings.
- Connection to microtunnel under bores 1 receival pit (CH 1145)
- Interconnecting microtunnel under bore 1 and 2 at launch pit (CH 1094 to CH 1102)
- Restoration by spray grass of all disturbed areas. Top soil to be removed and stockpiled for reinstatement prior to seeding
- Installation of trench stops and bulkheads as required
- Installation of soak pit to the steep section at the reservoir
- Site cleanup
Last updated: 12/10/2011
|
| |
 |
| Spring Farm - Neworks Alliance
|
|
|
.jpg) |
| Spring Farm - Networks Alliance
|
|
|
 |
| Micro-tunnel at Springfarm
|
|
|
 |
| Spring Farm - Networks Alliance
|
|
|
BCV Networks Alliance - Reticulation 11 and 12: Southern pipe cracking Portion 1 Involves the installation of 2.1km of OD125 and OD180 PE pipe, including and PE welding. Also included the setup and connection of temps, digging entry and exit pits, the backfill of open holes, pipe cracking, the installation of temporary services, fill and flush clairty tests, and pressure tests. Last updated: 12/10/2011 BCV Networks Alliance - Five Islands Road, Unanderra Involves the installation of trunkmain 2800m of DN300 DICL and SCL water main installation, including thrust bores under main roads, valves, hydrants, connections, and restraints. Includes exhume and relay sections and temporary water supply to customers. Project also involved: - Saw cutting of road surfaces
- Excavation by hand digging, vacuum or excavator
- Backfilling
- Final restoration of disturbed surfaces
- Installation and maintenance of traffic control measures
- Installation and maintenance of environmental controls
- Installation of temporary fencing and other structures
- Field compaction testing
- Potholing
To view footage of preliminary site scouting for the Five Islands Road project for BCV Networks Alliance please click through to Killard Excavation Pty Ltd's Youtube page via the link below: http://www.youtube.com/watch?v=cFrd8NZby1Y Last updated: 2/11/2011 The Reed Group - Northwest Precinct Works: Watermain Work Lot 11 - Kellyville, Sydney Involves the installation of 6.3km of DN450, 750, and 900 DICL and Sintakote SCL pipe, including thrust bores, concrete encasement, and major thrust block design. Includes dual and triple main installation within shared trench within roadway. Welding works, inspection points, valves, hydrants, and connections. A corridor was constructed through backyards by erecting ATF fencing once back fences were taken down. Strict access controls were adhered to and PCCA's obtained and signed off. Water main laying was to Sydney Water standards and supervised by Australian Water. To view footage of works for this project for The Reed Group please click through to Killard Excavation Pty Ltd's Youtube page via the link below: Last updated: 12/10/2011
|
| |
 |
| Welding setup
|
|
|
 |
| Corridor was constructed
|
|
|
 |
| Dual lift of DN900 sintakote pipe
|
|
|
 |
| Dual lift of DN900 sintakote pipe
|
|
|
2010The Reed Group - Worcester Road, Rouse Hill A 1050mm diameter RCP overflow line running from the Rouse Hill Reservoir down Worcester Road in Rouse Hill was newly constructed in the roadway. Works included traffic control, sawcutting pavement, installed 700m of reinforced concrete pipes, precast 1500mm x 1500mm concrete pits, insitu headwall and dissipater structure. Last updated: 6/2/2012 John Holland - Hoxton Park Recycled Water Stage 1Bulk and detail excavation works for pumpstation. Works will involve several different aspects, including: General Clearing, removal and stockpiling of topsoil, bulk and detail excavation, shoring, earth retnetion, compaction supply and placing of fill and backfill materials, preparation for structures, pavements and landscaping areas. Excavation Construction of drains, pumps, pits, water channels, and the provision, maintenance, and operation of pumping plant in water charged ground. Concrete - The supply of all concrete, cement mortar, and grout for in-situ and precast concrete elements
- The design, construction, erection, and removal of the formwork
- The supply, fabrication, and fixing of the reinforcing steel and other embedded items
- The placing, compacting, finishing, and curing of concrete, cement mortar,and grout
- The repair of faulty concrete work and cracks
Pipe Laying Installation of water pipeline, sewer pipeline, and stormwater drains. Types of pipes being installed include: steel pipes, ductile iron pipes, polyethylene pipes, glass reinforced pipes, PVC pipes, vitrified clay pipes, and concrete pipes. This job will also include the installation of flanges, thrust boring, and horiztonal directional drilling.
Last updated: 10/11/2011 September 2010 - July 2011 John Holland Water - Mardi-Mangrove Link Project WP07 Involves the installation of 9km of DN1000 Sintakote SCL welded and RRJ pipes on the Central Coast. Includes peripheral scour valve and air valve installation. Works occurred in both bush easement and along Yarramalong Road. Last updated: 11/8/2011
Hughes Trueman - Airds and Bradbury Renewal Project Scope of works included: - After an excavation point has been set out by a surveyor and existing mains and services have been located by electronic locators a 1.8 metre high security fence will be set out around the excavation point along with erosion and sediment control measures
- Clearing and grubbing will be undertaken along the length of the excavation. Stripping and removal of topsoil to depth of 200mm and removal to stockpile will be undertaken
- All invert levels of the water main will be determined via service locating
- Whilst excavating for the water mains the excavator bucket will not have teeth as a measure to prevent damage to the main. Hand excavation will begin whilst excavation incurs 200mm from the watermain
- Once each of the mains at the excavation location have been exposed the mains will be inspected by the Sydney Water representative and obvert levels will be taken and recorded. Soil samples may also be taken by the respresntative. On sections where the polyethylene sleeve has been removed for inspection these will be suitably repaired
- Backfilling with sand around pipes and up to 150mm over pipes will commence, and backfill and compaction with excavated material for remainder of trench will be undertaken. A compaction test will be performed. A 200mm depth of topsoil trimmed and seeded from stockpile will be placed over the excavation. Excess excavated material will be stored at the stockpile for excess excavated material
- The security fence will be removed along with erosion and sediment control measures and works will commence at the remaining excavation points
- All stop valves, air valves, hydrants, scour pipeline outlets, and scour valves will be located and levels taken at various points at the fitting location and recorded
- Installation and maintenance of traffic control measures
- Installation and maintenance of environmental controls
Last updated: 22/7/2011
BCV Networks Alliance - Hyde Park Road
This project involved the installation of trunkmain 1750m of DN450 DICL including OD560 PE via HDD bore under Carnarvon golf course. This project also involved the installation of valves, services, thrust blocks, and other connections, temporary restoration daily via hot mix, and traffic control measures. This project also involved: - Site establishment
- Installation and maintenance of environmental controls
- Installation and maintenance of traffic control measures
- Potholing
- Excavation and backfilling
- Field hydrostatic and compaction testing
- Saw cutting of concrete asphaltic concrete road pavement
- The supply of formwork, steel reinforcement and concrete encasing of mains
- The installation of thrust blocks
- Dewatering and management of groundwater and waste water
- The excavation, exhumation and disposal of existing water main
- Laying water main
- The fabrication, installation, and encasement of steel cement-lined sections
- The installation of temporary fencing and other structures
- Connecting pipework to services
- Site cleanup
To view footage of works for the Hyde Park Road project for BCV Networks Alliance please click through to Killard Excavation Pty Ltd's Youtube page via the link below: http://www.youtube.com/watch?v=fUpIWKhHA1Y Last updated: 2/11/2011
TRN - Barden Ridge Scope of works included: - Site establishment
- Installation and maintenance of traffic control measures
- Installation and maintenance of environmental controls
- Bulk earthworks including all necessary cutting, filling, compaction, trimming, disposal or import and testing of park area
- Construction of retaining walls, footings including backfilling, drainage and required finishes
- Supply and install lighting towers, including shading units, lamps, control gear, footings, cables and separate metering to park area
- Installing 825mm, 750mm, 600mm, 525mm, 450mm, 375mm diametre class 2 RRJ
- Installing junction pit 900mm x 900mm
- Reticulation of LV services
- Supply and installation of conduits
- Supply and excavation of 100mm hydrant and tee, flushing bend, stop valves, and water main
- Excavate and lay 150mm diametre SN8 sewer main
- Trench backfill
- Construct manholes
- Connecting pipework to services
Last updated: 5/8/2011
|
| |
 |
Plasson PRV
|
|
|
 |
Flanged pipework installation
|
|
|
 |
Installing PRV
|
|
|
 |
Pipework installation
|
|
|
Hughes Trueman - Erskineville Road and Angel Street, Newtown The project involved the replacement of approximately 75 metres of CICL DN150 watermain, with a combination of DICL and SCL mains being stage 2 of works in conjunction with the reconstruction of the Erskineville Road Overbridge, at the intersection of Erskineville Road and Angel Street, Newtown. Scope of works included: - Verify existing underground services
- Identify existing services using locating devices, potholing using hand excavation, vacuum systems and services search results
- Sawcut Angel Street End
- Excavate for pipes
- Installation of DICL and SCL pipes and bends at both ends
- Fixing of reinforcement and pouring concrete for surrounding the DICL pipes and bends
- Lifting and replacing concrete planks
- Laying of SCL pipes
- Installation of brackets
- Installation and maintenance of traffic control measures
- Installation and maintenance of environmental controls
Last updated: 22/7/2011 September 2009 - June 2010 BCC Networks Alliance - Nuwarra Road, Moorebank Involved laying 750m of DN600 DICL and OD660 SCL sintakote and concrete encased pipe in Nuwarra Road, Moorebank. Watermain installation includes installation in tight easement beneath retaining wall. Testing includes soil classification every 100m. Also involved site establishment, installation and maintenance of environmental controls, installation and maintenance of traffic control measures, potholing, excavation and backfill, field hydrostatic and compaction testing, saw cutting of concrete and asphaltic concrete road pavement, installation of thrust blocks, dewatering and management of groundwater and waste water, the excavation, exhumation and disposal of existing water main, laying of water main and fittings, the fabrication, installation and encasement of steel cement-lined sections, installation of temporary fencing and other structures, and connecting pipework to services. Due to constraints from other services within the easement and the HP gas at the proposed thrust areas, a redesign called for restraining reinforcing concrete piles and additional reinforcement and encasement of the water main. Pipe laying was technical and many services were supported. Existing stormwater pits were cut, benched and covered to allow concrete encased water main to pass. Water pipe laid through retaining wall, and wall and footings repaired post installation. July 2009 - September 2009 Mirvac / John M Daly - Camden Valley Way, Prestons Involved the installation of 2300m of DN375 PVC watermain and additional 350m of DN375 SCL pipe sleeved through thrust bore DN600 steel casing to Sydney Water standards. Project also included: - Site establishment
- The installation and maintenance of environmental controls
- Installation and maintenance of traffic control measures
- Excavation for water reticulation pipe, bedding, laying of joints
- Backfilling
- Installation of thrust bores
- Installation of gravity scours
- Installation of air valves
- Installation of DN375 hydrant
- Installation of DN375 piping
- Installation of 300mm x 200mm DICL taper to bring new DN300 PVC main down to expected DN200 PVC main
- Installation of 200mm x 250mm DICL taper
- Installation of DN250 PVC pipe
- Sawcut of concrete and asphaltic concrete road pavement
- Compaction tests
- Hydrostatic tests
- Connecting pipework to services
- Site cleanup
Last updated: 5/8/2011 Bulk Water Alliance - Cottor Dam Project M2C - Canberra Involved pipe laying, including excavation to design levels, bed, lay, surround, and backfill the pipework. Pipe laying included 1404 MSCL sintakote pipe, DN960 DICL mains and DN1200 to 450 RCP stormwater overflow. Works for lead in and outlet pipework for new Cottor Dam pump station. This project also involved the installation of electrical conduits, including the excavation and installation of pre-cast pits. This project also involved concrete encasement, concrete bedding, thrust blocks, trench stops, bulkheads for pipeline, the installation of temporary structures, and the installation and maintenance of environmental controls. Water main laying to Australian Water standards.
|
| |
 |
| M2C Cotter Dam Project, Canberra. DN960
|
|
|
 |
Sintakote Pipe
Canberra
|
|
|
 |
| Canberra
Sintakote Pipe
|
|
|
 |
| Canberra
|
|
|
Water Supply Alliance - Preston - North Essendon Pipeline Renewal Project
Scope of works WP2 Stage 5 included: - Lift and relay and construction of new MSCL pipeline
- Cathodic protection works including transformer rectifier units, cables, electrolysis test points ect
- Work to Edgars Creek crossing including reinstate creek banks and bedrock, tree removal and protection complete with concrete encasing pipe below flood level
- Connection to YVW 600 diametre pipes including installation only the butterfly valves
- Supply and place mass N25 concrete between new and existing pipe
Scope of works WP3 Stage 6 included: - Lift and relay and construction of new MSCL pipeline
- Cathodic protection works including cables, electrolysis test points
Other aspects of works include: - Installation and maintenance of traffic control measures
- Installation and maintenance of environmental controls
- Excavation of trenches including all temporary works and ground support, and excavation and disposal of rocks
- Supply and place bedding and backfilling material to excavated trenches, and disposal of excess spoil and rock off site
- Saw cutting through asphalt for the alignment of the new pipeline
- All control measures, including dust suppression and slurry vacuum ect, required to carry out works
- Supply and installation of air and scour valves
- Supply and installation of marker posts and bollards
- Pressure testing of the pipeline and rectification of any leaks
- Abandoning connections, valve bypass, blank ends ect to existing pipes
- Removing valve spindles, hydrants, and other furniture of abandoned pipe from surface
- Installation and removal of temporary structures, including safety fencing ect
- Connecting new piping to services
- Demobilisation and site cleanup
Last updated: 26/7/2011
BCC Networks Alliance - Waverly and Gerringong Involved valve installation at Birrell Street, Waverly and Fern Street, Gerringong.
Birrell Street, Waverly
This part of the project also included site establishment, the installation and maintenance of environmental controls, the installation and maintenance of traffic controls, the installation of 2x900x5307mm piles, removal and installation of DN600 valve, extension needle, bypass system, pipe work, RCC slabs, and precast surface box, the installation of anchor blocks, backfilling, and compaction and testing. Last updated: 14/4/2011
BCC Networks Alliance - Kingsway, Miranda Completed installation of 400m of DN600 DICL watermain at the Kingsway, Miranda.
This project involved:
- The installation of 313 meters of DN600 RRJ DICL bedded and backfilled using 20:1 stabilised sand
- The installation of 26 meters of DN500 RRJ DICL exhume and relay and backfilled using 20:1 stabilised sand
- The installation of 38 meters of 375 RRJ DICL cross connection across The Kingsway and backfilled using 20:1 stabilised sand
- Transferring existing DN100 Fire service from existing DN500 to existing DN375 by hot tapping
- All associated works such as installation of valves, cross connections, thrust blocks, scour pits, hydrants, property services, reticulation, and trunk staged connections
- Traffic control to Council/RTA approval and all works carried out during night and weekend working times.
The project also included site establishment, the installation and maintenance of environmental controls, potholing of services that are crossing or adjacent to the alignment as required, testing spoil at 100 meter intervals, excavation and backfill, field hydrostatic pressure and compaction testing, saw cutting of concrete and asphaltic concrete road pavement, dewatering and management of groundwater and waste water runoff, the excavation, exhumation and disposal of existing water main, and connecting pipework to services. March 2009 - December 2009 McConnell Dowell - St. Marys to Quakers Hill Involved the installation of 4.5km of DN450 and DN375 dual recycled water main in St. Marys to Quakers Hill for the Recycled Water project. This project also involved the laying of 1500m of DN300 DICL pipe in asbestos contaminated ground, the installation of dual main in Forrester and Links Road, St. Marys. This project also involved crossing Breakfast Creek in concrete encased PE, including environmental controls, installing scour valve pits, backfilling and laying hot mix.
Last updated: 4/8/2011 January 2009 - March 2009 McConnell Dowell - Barton Park, Arncliff
Involved the removal and installation of DN300 recycled water main in Barton Park and International Peace Park, and the excavation and disposal of asbestos contaminated spoil, lay geofabric, and place pipes, fittings, valves, thrust blocks, and anchors. Southern Cross Developments - McIntyre Street, Gordon Involved the excavation and installation of 200m DN150 watermain, including a 25m thrust bore steel encasing under the Pacific Highway at Gordon.
This project involved: - The installation of DN150 UPVC main pipe line along McIntyre Street and DN150 crossing Pacific Highway
- Supply, installation, testing, and commission of water main main amplification system
- The installation of flanged tee and stop valve, isolation valves, and sluice valves
- The installation and maintenance of traffic control measures
- Backfilling
BCC Networks Alliance - Glenfield to Hoxton Park Involved the excavation and installation of 7km of 450mm recycled water main from Glenfield to Hoxton Park, including Crotia Avenue. John Holland Pty Ltd - Picton Involved the installation of approximately 2.6km of DN150 PVC water main from Picton to Allied Mills flourmill. January 2007 - April 2007 EL Civil - Crows Nest, Cremorne and Gordon Involved the installation of approximately 270m of DN150 Blue Brute water main. Diona Pty Ltd - Maitland Involved the installation of 1km of 600mm diametre Hobas water main for Hunter Water Dora Creek, Maitland.
|
| |
 |
| St Marys to Quakers Hill dual recycled watermain for McConnell Dowell
|
|
|
 |
| Pipelaying Dual Main McConnell Dowell at Forrester Street, St Marys
|
|
|
 |
Machine use McConnell Dowell at Forrester Street, St Marys
|
|
|
 |
McConnell Dowell at Forrester Street, St Marys
|
|
|
|