This project involved pipe laying, including excavation to design levels, bed, lay, surround, and backfill the pipework. Pipe laying included 1404 MSCL Sintakote pipe, DN960 DICL mains and DN1200 to 450 RCP stormwater overflow. Works for lead in and outlet pipework for new Cottor Dam pump station. This project also involved the installation of electrical conduits, including the excavation of pre-cast pits, concrete encasement, concrete bedding, thrust blocks, trench stops, bulkheads for pipeline, the installation of temporary structures, and the installation and maintenance of environmental controls. Water main laying to Australian Water standards. Last updated: 28/7/2011 M2C Cotter Dam Pipe Installation. Included multiple SINTAKOTE Water Main welded pipe laying through rock.
|